Projects

picture-16

AN INSIDER'S LOOK

River John

The River John, Nova Scotia test turbine established a Commercial Operation Date (COD) on December 18th, 2006. The turbine is an Enercon E-48 with a capcity of .800MW.

The Digby Asset maintains a 15-Year Power Purchase Agreement (PPA) with Nova Scotia Power Inc. and is a joint venture project with an Alberta Company on a 50% working interest basis. The installation was one of 7 RESL test turbines that was established throughout the province as part of Nova Scotia Power’s RFP for undewr 2MW installations.